{"id":1158,"date":"2020-11-27T06:23:12","date_gmt":"2020-11-27T06:23:12","guid":{"rendered":"https:\/\/www.technostruct.com\/blog\/?p=1158"},"modified":"2024-03-20T08:52:06","modified_gmt":"2024-03-20T08:52:06","slug":"3-reasons-why-prefabrication-is-the-future-of-architecture","status":"publish","type":"post","link":"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/","title":{"rendered":"3 Reasons Why Prefabrication Is the Future of Architecture"},"content":{"rendered":"\n<p>The construction sector is one of the fastest-growing sectors on account of the ever-evolving living requirements that come with urbanization and the need to design and build best-in-class and high-value structures for various purposes \u2013 residential, offices, entertainment, and whatnot. Today, the construction industry employs about 7 percent of the world\u2019s working-age population and is one of the world economy\u2019s largest sectors, with $10 trillion spent on construction-related goods and services every year, as per a new McKinsey Global Institute report.<\/p>\n\n\n\n<p>The introduction of prefabrication technology in the construction industry has helped answer and solve several construction challenges, but the technology has not captured the market at a similar pace. Even though according to a survey conducted by McGraw Hill, 66% of the respondents (contractors) claimed that prefabrication and modularization help shorted project timelines by 4 weeks or, in some cases, by half. Further, contractors believe that prefabrication and modular construction have the capability to improve productivity by 92%, help establish a competitive advantage by 85%, and generate greater ROI by 70%. The study also suggested that BIM&#8217;s application allowed 77% of the contractors to use prefabrication on larger, more complex projects.<\/p>\n\n\n\n<p><strong>Fact: <\/strong>The iconic 21-story, 500-room hotel, San Antonio\u2019s iconic Hilton Palacio del Rio, opened in 1968. It was one of many architectural attractions designed for the 1968 World\u2019s Fair, which was designed and built in only 202 days, a timeline made possible by the extensive use of modular construction techniques. Every room was built and furnished in its entirety in an off-site facility and subsequently installed by a 300-ton super-crane, a practice that helped the developers condense onsite construction into a 46-day window.<\/p>\n\n\n\n<p>Today, a couple of buildings originate with the core idea of prefab technology, but the case was not the same a couple of years ago. Here are 3 reasons why it is the future of construction today and why they will influence the AEC industry in the coming years:<\/p>\n\n\n\n<p><strong>Boost Project Quality and Achieve Construction within Timeline: <\/strong>Prefabricated construction is done within a controlled environment specifically designed to manufacture and assemble individual prefabricated components. This allows the designer, contractor, and engineers to run quality checks and review the complete process, which would not have been possible in traditional construction methods. The project site is safe, organized, and clutter-free, which improves productivity and reduces any accidental risks. Prefab also offers optimized workflow and process \u2013 as the same team builds and assembles the structure in a controlled environment.<\/p>\n\n\n\n<p><strong>Fact: <\/strong>Pipa House by Bernardes Arquitetura, Porto Feliz, SP, Brazil, winner of the 2019 Popular Choice A+Award in the Architecture +Prefab category. The prefabricated concrete house was designed for building efficiency \u201cthrough an industrialized system that allowed its rapid execution and very low waste production.<\/p>\n\n\n\n<p><strong>Helps overcome the labor shortage issue:<\/strong> The prefabrication construction method employs less labour than traditional methods and frees up time for field workers to cover more prefab projects \u2013 and help mitigate the problem of the skilled labour shortage.<\/p>\n\n\n\n<p><strong>Fact: <\/strong>Clinton Corners by Lake|Flato Architects, Clinton Corners, NY, winner of the 2019 Jury A+Award in the Architecture +Prefab category. Fabricated in a nearby facility, the exposed heavy timber frame and super-insulated wall panels were delivered to the site and assembled in less than three weeks.<\/p>\n\n\n\n<p><strong>Save time and money by standardizing components:<\/strong> The integration of building information modeling with prefabrication saves a lot of time in overcoming measurement miscalculation issues. Further, pairing prefab construction with VDC is an intelligent process that limits project variability and allows one to better manage schedule and budgets.<\/p>\n\n\n\n<p><strong>Conclusion:<\/strong><\/p>\n\n\n\n<p>In this changing climate, prefabrication is the perfect tool to build a house, commercial complex, or an entertainment hub with a high degree of customization, competitive pricing, quick turnaround time, and fewer resources. BIM-driven prefabrication has just been able to scratch only the surface and has a lot in store for the future.<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/www.technostruct.com\/\">TechnoStruct LLP<\/a> <\/strong>is a leading <strong><a href=\"https:\/\/www.technostruct.com\/\">BIM Service Provider in C.A<\/a><\/strong>. that specializes in providing <strong><a href=\"https:\/\/www.technostruct.com\/mechanical-engineering-solutions.php\">mechanical and engineering solutions<\/a><\/strong>, designing, solar engineering solutions, and construction solutions to commercial projects across industries, with a diversified range of services including but not limited to BIM consulting services, Mechanical Electrical Plumbing (MEP) engineering and designs, Mechanical Subcontractor, Solar, Electrical Subcontractor, and many more.<\/p>\n  <div class=\"related-post slider\">\r\n        <div class=\"headline\">Related Post<\/div>\r\n    <div class=\"post-list owl-carousel\">\r\n\r\n            <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"All About Scan To BIM\" href=\"https:\/\/www.technostruct.com\/blog\/2018\/08\/28\/scan-to-bim-bim-consultancy-technostruct\/?related_post_from=169\">\r\n        All About Scan To BIM  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"All About Scan To BIM\" href=\"https:\/\/www.technostruct.com\/blog\/2018\/08\/28\/scan-to-bim-bim-consultancy-technostruct\/?related_post_from=169\">\r\n\r\n      <img loading=\"lazy\" decoding=\"async\" width=\"439\" height=\"394\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2018\/08\/Scan-Images.png\" class=\"attachment-full size-full wp-post-image\" alt=\"Scan to BIM\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2018\/08\/Scan-Images.png 439w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2018\/08\/Scan-Images-300x269.png 300w\" sizes=\"auto, (max-width: 439px) 100vw, 439px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    Industries across every spectrum have been working <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2018\/08\/28\/scan-to-bim-bim-consultancy-technostruct\/?related_post_from=169\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n              <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"3 Reasons Why Prefabrication Is the Future of Architecture\" href=\"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/?related_post_from=1158\">\r\n        3 Reasons Why Prefabrication Is the Future of Architecture  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"3 Reasons Why Prefabrication Is the Future of Architecture\" href=\"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/?related_post_from=1158\">\r\n\r\n      <img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1432\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-scaled.jpg\" class=\"attachment-full size-full wp-post-image\" alt=\"BIM consultants in Southern California\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-scaled.jpg 2560w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-300x168.jpg 300w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-1024x573.jpg 1024w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-768x430.jpg 768w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-1536x859.jpg 1536w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-2048x1146.jpg 2048w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-740x414.jpg 740w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-355x199.jpg 355w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    The construction sector is one of the <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/?related_post_from=1158\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n              <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\u00a0\" href=\"https:\/\/www.technostruct.com\/blog\/2022\/08\/31\/4-proven-tips-to-bring-down-the-cost-of-mep-installations-across-construction-projects\/?related_post_from=1382\">\r\n        4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\u00a0  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\u00a0\" href=\"https:\/\/www.technostruct.com\/blog\/2022\/08\/31\/4-proven-tips-to-bring-down-the-cost-of-mep-installations-across-construction-projects\/?related_post_from=1382\">\r\n\r\n      <img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_.jpg\" class=\"attachment-full size-full wp-post-image\" alt=\"4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_.jpg 800w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_-300x169.jpg 300w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_-768x432.jpg 768w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_-355x199.jpg 355w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    Mechanical, electrical, and plumbing systems (MEP) today <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2022\/08\/31\/4-proven-tips-to-bring-down-the-cost-of-mep-installations-across-construction-projects\/?related_post_from=1382\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n              <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"How Augmented Reality and Virtual Reality are Transforming BIM\" href=\"https:\/\/www.technostruct.com\/blog\/2023\/12\/26\/how-augmented-reality-and-virtual-reality-are-transforming-bim\/?related_post_from=1553\">\r\n        How Augmented Reality and Virtual Reality are Transforming BIM  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"How Augmented Reality and Virtual Reality are Transforming BIM\" href=\"https:\/\/www.technostruct.com\/blog\/2023\/12\/26\/how-augmented-reality-and-virtual-reality-are-transforming-bim\/?related_post_from=1553\">\r\n\r\n      <img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"414\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/How-Augmented-Reality-and-Virtual-Reality-are-Transforming-BIM.webp\" class=\"attachment-full size-full wp-post-image\" alt=\"How Augmented Reality and Virtual Reality are Transforming BIM\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/How-Augmented-Reality-and-Virtual-Reality-are-Transforming-BIM.webp 740w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/How-Augmented-Reality-and-Virtual-Reality-are-Transforming-BIM-300x168.webp 300w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/How-Augmented-Reality-and-Virtual-Reality-are-Transforming-BIM-355x199.webp 355w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    Imagine donning a pair of sleek glasses <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2023\/12\/26\/how-augmented-reality-and-virtual-reality-are-transforming-bim\/?related_post_from=1553\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n      \r\n  <\/div>\r\n\r\n  <script>\r\n      <\/script>\r\n  <style>\r\n    .related-post {}\r\n\r\n    .related-post .post-list {\r\n      text-align: left;\r\n          }\r\n\r\n    .related-post .post-list .item {\r\n      margin: 10px;\r\n      padding: 0px;\r\n          }\r\n\r\n    .related-post .headline {\r\n      font-size: 18px !important;\r\n      color: #999999 !important;\r\n          }\r\n\r\n    .related-post .post-list .item .post_title {\r\n      font-size: 15px;\r\n      color: #ff6600;\r\n      margin: 10px 0px;\r\n      padding: 0px;\r\n      line-height: 22px;\r\n      display: block;\r\n      text-decoration: none;\r\n          }\r\n\r\n    .related-post .post-list .item .post_thumb {\r\n      max-height: 220px;\r\n      margin: 10px 0px;\r\n      padding: 0px;\r\n      display: block;\r\n          }\r\n\r\n    .related-post .post-list .item .post_excerpt {\r\n      font-size: 14px;\r\n      color: #353535;\r\n      margin: 10px 0px;\r\n      padding: 0px;\r\n      display: block;\r\n      text-decoration: none;\r\n          }\r\n\r\n    .related-post .owl-dots .owl-dot {\r\n          }\r\n\r\n      <\/style>\r\n      <script>\r\n      jQuery(document).ready(function($) {\r\n        $(\".related-post .post-list\").owlCarousel({\r\n          items: 3,\r\n          responsiveClass: true,\r\n          responsive: {\r\n            0: {\r\n              items: 1,\r\n            },\r\n            768: {\r\n              items: 2,\r\n            },\r\n            1200: {\r\n              items: 3,\r\n            }\r\n          },\r\n                      rewind: true,\r\n                                loop: true,\r\n                                center: true,\r\n                                autoplay: true,\r\n            autoplayHoverPause: true,\r\n                                nav: false,\r\n            navSpeed: 1000,\r\n            navText: ['<i class=\"fas fa-chevron-left\"><\/i>', '<i class=\"fas fa-chevron-right\"><\/i>'],\r\n                                dots: true,\r\n            dotsSpeed: 1200,\r\n                                                    rtl: false,\r\n          \r\n        });\r\n      });\r\n    <\/script>\r\n  <\/div>\r\n","protected":false},"excerpt":{"rendered":"<p>The construction sector is one of the fastest-growing sectors on account of the ever-evolving living requirements that come with urbanization and the need to design and build best-in-class and high-value&#8230; <\/p>\n  <div class=\"related-post slider\">\r\n        <div class=\"headline\">Related Post<\/div>\r\n    <div class=\"post-list owl-carousel\">\r\n\r\n            <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"All About Scan To BIM\" href=\"https:\/\/www.technostruct.com\/blog\/2018\/08\/28\/scan-to-bim-bim-consultancy-technostruct\/?related_post_from=169\">\r\n        All About Scan To BIM  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"All About Scan To BIM\" href=\"https:\/\/www.technostruct.com\/blog\/2018\/08\/28\/scan-to-bim-bim-consultancy-technostruct\/?related_post_from=169\">\r\n\r\n      <img width=\"439\" height=\"394\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2018\/08\/Scan-Images.png\" class=\"attachment-full size-full wp-post-image\" alt=\"Scan to BIM\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2018\/08\/Scan-Images.png 439w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2018\/08\/Scan-Images-300x269.png 300w\" sizes=\"auto, (max-width: 439px) 100vw, 439px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    Industries across every spectrum have been working <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2018\/08\/28\/scan-to-bim-bim-consultancy-technostruct\/?related_post_from=169\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n              <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"3 Reasons Why Prefabrication Is the Future of Architecture\" href=\"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/?related_post_from=1158\">\r\n        3 Reasons Why Prefabrication Is the Future of Architecture  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"3 Reasons Why Prefabrication Is the Future of Architecture\" href=\"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/?related_post_from=1158\">\r\n\r\n      <img width=\"2560\" height=\"1432\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-scaled.jpg\" class=\"attachment-full size-full wp-post-image\" alt=\"BIM consultants in Southern California\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-scaled.jpg 2560w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-300x168.jpg 300w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-1024x573.jpg 1024w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-768x430.jpg 768w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-1536x859.jpg 1536w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-2048x1146.jpg 2048w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-740x414.jpg 740w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2020\/11\/Blog-1-355x199.jpg 355w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    The construction sector is one of the <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2020\/11\/27\/3-reasons-why-prefabrication-is-the-future-of-architecture\/?related_post_from=1158\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n              <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\u00a0\" href=\"https:\/\/www.technostruct.com\/blog\/2022\/08\/31\/4-proven-tips-to-bring-down-the-cost-of-mep-installations-across-construction-projects\/?related_post_from=1382\">\r\n        4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\u00a0  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\u00a0\" href=\"https:\/\/www.technostruct.com\/blog\/2022\/08\/31\/4-proven-tips-to-bring-down-the-cost-of-mep-installations-across-construction-projects\/?related_post_from=1382\">\r\n\r\n      <img width=\"800\" height=\"450\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_.jpg\" class=\"attachment-full size-full wp-post-image\" alt=\"4 Proven Tips to Bring Down the Cost of MEP Installations across Construction Projects\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_.jpg 800w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_-300x169.jpg 300w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_-768x432.jpg 768w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2022\/09\/TechnoStruct_-355x199.jpg 355w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    Mechanical, electrical, and plumbing systems (MEP) today <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2022\/08\/31\/4-proven-tips-to-bring-down-the-cost-of-mep-installations-across-construction-projects\/?related_post_from=1382\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n              <div class=\"item\">\r\n          \r\n  <a class=\"title post_title\"  title=\"Core and Shell in Construction: Meaning, Usage, and it&#8217;s Future\" href=\"https:\/\/www.technostruct.com\/blog\/2023\/12\/28\/core-and-shell-construction-meaning-usage-and-its-future\/?related_post_from=1560\">\r\n        Core and Shell in Construction: Meaning, Usage, and it&#8217;s Future  <\/a>\r\n\r\n  <div class=\"thumb post_thumb\">\r\n    <a  title=\"Core and Shell in Construction: Meaning, Usage, and it&#8217;s Future\" href=\"https:\/\/www.technostruct.com\/blog\/2023\/12\/28\/core-and-shell-construction-meaning-usage-and-its-future\/?related_post_from=1560\">\r\n\r\n      <img width=\"740\" height=\"414\" src=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/Unveiling-Architectural-Ingenuity-in-Core-and-Shell-Construction.webp\" class=\"attachment-full size-full wp-post-image\" alt=\"Unveiling Architectural Ingenuity in Core and Shell Construction\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/Unveiling-Architectural-Ingenuity-in-Core-and-Shell-Construction.webp 740w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/Unveiling-Architectural-Ingenuity-in-Core-and-Shell-Construction-300x168.webp 300w, https:\/\/www.technostruct.com\/blog\/wp-content\/uploads\/2023\/12\/Unveiling-Architectural-Ingenuity-in-Core-and-Shell-Construction-355x199.webp 355w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/>\r\n\r\n    <\/a>\r\n  <\/div>\r\n  <p class=\"excerpt post_excerpt\">\r\n    In the dynamic realm of construction, \"Core <a class=\"read-more\" href=\"https:\/\/www.technostruct.com\/blog\/2023\/12\/28\/core-and-shell-construction-meaning-usage-and-its-future\/?related_post_from=1560\"> Read more<\/a>  <\/p>\r\n        <\/div>\r\n      \r\n  <\/div>\r\n\r\n  <script>\r\n      <\/script>\r\n  <style>\r\n    .related-post {}\r\n\r\n    .related-post .post-list {\r\n      text-align: left;\r\n          }\r\n\r\n    .related-post .post-list .item {\r\n      margin: 10px;\r\n      padding: 0px;\r\n          }\r\n\r\n    .related-post .headline {\r\n      font-size: 18px !important;\r\n      color: #999999 !important;\r\n          }\r\n\r\n    .related-post .post-list .item .post_title {\r\n      font-size: 15px;\r\n      color: #ff6600;\r\n      margin: 10px 0px;\r\n      padding: 0px;\r\n      line-height: 22px;\r\n      display: block;\r\n      text-decoration: none;\r\n          }\r\n\r\n    .related-post .post-list .item .post_thumb {\r\n      max-height: 220px;\r\n      margin: 10px 0px;\r\n      padding: 0px;\r\n      display: block;\r\n          }\r\n\r\n    .related-post .post-list .item .post_excerpt {\r\n      font-size: 14px;\r\n      color: #353535;\r\n      margin: 10px 0px;\r\n      padding: 0px;\r\n      display: block;\r\n      text-decoration: none;\r\n          }\r\n\r\n    .related-post .owl-dots .owl-dot {\r\n          }\r\n\r\n      <\/style>\r\n      <script>\r\n      jQuery(document).ready(function($) {\r\n        $(\".related-post .post-list\").owlCarousel({\r\n          items: 3,\r\n          responsiveClass: true,\r\n          responsive: {\r\n            0: {\r\n              items: 1,\r\n            },\r\n            768: {\r\n              items: 2,\r\n            },\r\n            1200: {\r\n              items: 3,\r\n            }\r\n          },\r\n                      rewind: true,\r\n                                loop: true,\r\n                                center: true,\r\n                                autoplay: true,\r\n            autoplayHoverPause: true,\r\n                                nav: false,\r\n            navSpeed: 1000,\r\n            navText: ['<i class=\"fas fa-chevron-left\"><\/i>', '<i class=\"fas fa-chevron-right\"><\/i>'],\r\n                                dots: true,\r\n            dotsSpeed: 1200,\r\n                                                    rtl: false,\r\n          \r\n        });\r\n      });\r\n    <\/script>\r\n  <\/div>\r\n","protected":false},"author":1,"featured_media":1159,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1158","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/posts\/1158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/comments?post=1158"}],"version-history":[{"count":5,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/posts\/1158\/revisions"}],"predecessor-version":[{"id":1169,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/posts\/1158\/revisions\/1169"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/media\/1159"}],"wp:attachment":[{"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/media?parent=1158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/categories?post=1158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.technostruct.com\/blog\/wp-json\/wp\/v2\/tags?post=1158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}